By: Sander Schaathun

Report No.

8323

Discipline/Origin

Drilling
No origin

Well

Kjøttkake
35/10-13

Date created

2025/02/19
290 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Deepsea Yantai


What happened in Reservoir section:
1” flowmeter hose burst causing spillage of OBM in the cement unit, while bleeding off during the XLOT dummy test. The reason the hose burst is probably that the OBM was too viscous and gelled causing it to plug up due to such a small diameter hose.

What Was Planned

Bleeding of through flow meter during XLOT

What Was Learned

Changed the 1” hose to a 2” hose giving more room for flow.

What Actions Are Required

Use 2” flowmeter hose and higher rated hoses. As the flowmeter used was a new type, it could also be wise to use consider the old one in future planning.